Sunday 2 October 2011

The first signs of progress

Well we're two weeks down in the great bathroom re-do part two. Since it's been hard to get the time to put up these posts here are some pictures of where we were half way through the first week. The walls have been patched and plastered and the insulations is about to go in under the floor.

 Re-doing your bathroom always makes you happy for the small things. We may not have a shower, tub or sink, but at least we have a toilet! It doesn't quite have a working flush,but this hook up is not too bad.

Here's next big step (sorry that it's blurry)  with the floor tiles going in!! So excited to see it start to take shape.



No comments:

Post a Comment