Well we're two weeks down in the great bathroom re-do part two. Since it's been hard to get the time to put up these posts here are some pictures of where we were half way through the first week. The walls have been patched and plastered and the insulations is about to go in under the floor.
Here's next big step (sorry that it's blurry) with the floor tiles going in!! So excited to see it start to take shape.
No comments:
Post a Comment